Construction of Solar Power Plants

Solar power plants (SPPs) are a key element of modern energy infrastructure aimed at ensuring the production of clean and renewable electricity. Ukraine, as a country with great potential in the field of solar technologies, is actively developing the solar power plant (SPP) sector to increase its energy independence and reduce greenhouse gas emissions.

Ukraine's Focus on Green Energy

Solar energy in Ukraine
Solar energy has great potential in Ukraine due to the high level of solar radiation, which averages about 1,500-1,800 kWh per m² per year. This makes Ukraine one of the countries with high potential for the development of solar energy systems.
Solar power plants (SPPs)
Solar power plants are specialized installations that use solar panels to convert sunlight into electrical energy. The main components of a solar power plant include solar panels, inverters, batteries (in some cases), and infrastructure for collecting, storing, and distributing electricity.
Development of solar energy in Ukraine
Ukraine recently became a leader in the installation of turnkey solar power plants, indicating a trend towards active development of solar energy in the country. Many companies specialize in the construction and installation of solar power plants for various types of consumers, from households to industrial enterprises.
Design and development of solar power plants
Designing and developing solar power plants is a complex task that requires engineering expertise and careful planning. The project must take into account the location of the plant, the orientation of the solar panels, connection to the electrical grid and many other aspects. The development includes the selection of optimal materials and technologies for maximum performance and durability of the solar power plant.
Construction and installation
After the design phase, the solar power plant moves to the construction and installation phase. This process includes the assembly of solar panels, installation of inverters, electrical work, and infrastructure for collecting and transmitting electricity. The construction of a solar power plant must meet the highest safety and quality standards.
Turnkey solar power plants"
The turnkey concept means that companies specializing in the construction of solar power plants take on the entire cycle of work, from design to installation and connection to the electricity grid. This reduces the hassle for customers and contributes to the rapid implementation of solar technologies.
Design and development of solar power plants
In times of war, solar power plants can be subject to shelling and damage, leading to their cessation of operation. Restoring such plants requires an assessment of the damage and appropriate repair or replacement of damaged components. The restoration process may also include updating technologies and increasing resilience to such situations.
Design and development of solar power plants
In times of war, solar power plants can be subject to shelling and damage, leading to their cessation of operation. Restoring such plants requires an assessment of the damage and appropriate repair or replacement of damaged components. The restoration process may also include updating technologies and increasing resilience to such situations.
Solar power plants in the future

Solar power plants in Ukraine are currently in a phase of active growth. Thanks to the development of technologies and increasing awareness of the benefits of using solar energy, solar power plants are becoming increasingly accessible and popular for households, businesses, and governments.

 

Ukraine continues to actively develop the solar energy sector, promoting the use of clean and renewable energy to meet its energy needs. Turnkey solar power plants are becoming an important tool in achieving this goal, helping to reduce greenhouse gas emissions and ensure a sustainable and reliable electricity supply.

WHY ENERHO-SYLA GROUP

RELIABILITY that
confirmed

WE HAVE A FULL PACKAGE OF LICENSES TO CARRY OUT WORK ON THE CONSTRUCTION OF FEZ

Great
EXPERIENCE

More than 82 power plants,
with a capacity of 1320.32 MW

Full
SERVICE

SERVICE
IMPLEMENTED PROJECTS

Complex
approach

A FULL COMPLEX OF WORKS: FROM FEASIBILITY ANALYSIS TO TURNKEY CONSTRUCTION.

Velikiyka
team

WE WORK IN ALL REGIONS OF UKRAINE AND ABROAD

Iron
guarantees

WE MEET STANDARDS
AND WE PROVIDE GUARANTEES

The main stages of construction of the SES:

study of all materials available at the initial stage of the project (land documents, data on engineering surveys, assessment of the possibility of connecting to networks, information on weather and insolation);
coordination of requirements for the facility (list of main equipment, requirements for it, capacity of the future solar power plant, construction and commissioning phases, list of contractor's works and services, etc.);
coordination of requirements for the facility (list of main equipment, requirements for it, capacity of the future solar power plant, construction and commissioning phases, list of contractor's works and services, etc.);
preparation of a commercial offer and a schedule of work;
preparation and analysis of the project financial model;
signing of a general contract;
work on obtaining Technical Conditions for connecting the facility to the network;
development and approval of a working project;
obtaining the necessary permits to begin construction work;
equipment supply;
construction and installation works;
connecting a solar power plant to the grid;
commissioning and trial operation;
registration of licenses and "green tariff";
operation and monitoring of solar power plants;
solar power plant maintenance

We carry out a full range of works on the construction of solar power plants:

  • design work;
  • preparatory work (planning of the construction site, construction of temporary roads);
  • fence installation;
  • arrangement of fuel fields;
  • installation of PEM fastening systems;
  • installation of PEM;
  • earthworks;
  • electrical installation work;
  • installation of lightning protection, lighting, security and monitoring systems;
  • construction of solar power plants;
  • construction (installation) of KTP;
  • connection to an external network;
  • implementation of ASKOE.

Main components of a solar station:

  • Solar panels;
  • Inverter;
  • Battery;
  • DC/AC protection kits;
  • Mounting kit;
  • Cables, consumables;

Designed solar power plants:

Name
Power
Arrangement
Year of construction
FES "Kostogrizove"«
18.064 MW
Kherson region.
2018.
Kyselivka FES«
17.702 MW
Kherson region.
2018.
FES "Poniativka"«
18.819 MW
Kherson region.
2018.
FES "Afanasiyevka"«
20.463 MW
Kherson region.
2018.

Name
Power
Arrangement
Year of construction
FES "Lyubymovka"«
11.115 MW
Mykolaiv region.
2019.
Basaltova FES«
19.198 MW
Mykolaiv region.
2019.
Stepnogorsk FES«
19.205 MW
Zaporizhzhia region.
2019.
FES "Balivka"«
21.669 MW
Dnipropetrovsk region.
2019.
FES "Yelanets 1"«
13,100 MW
Mykolaiv region.
2019.
Pogrebishche FES«
11.7 MW
Vinnytsia region.
2019.
FES "Belashki"«
7.8 MW
Vinnytsia region.
2019.
FES "Shyroke"«
4.5 MW
Dnipropetrovsk region.
2019.
FES "Mykhailivka"«
11 MW
Khmelnytskyi region.
2019.
FES "Yelanets 2"«
6.5 MW
Mykolaiv region.
2019.
FES "Bereznehuvate"«
13,430 MW
Mykolaiv region.
2019.
FES "Novokantakuzivka"«
13.288 MW
Mykolaiv region.
2019.
FES "Moivka"«
20.6 MW
Vinnytsia region.
2019.
FES "Velyka Belozirka"«
19.19 MW
Zaporizhzhia region.
2019.
Teplichna FES«
13.2 MW
Mykolaiv region.
2019.
Kytsmanskaya FES«
14.5 MW
Chernivtsi region.
2019.
FES "Novokondakovo"«
19.03 MW
Mykolaiv region.
2019.
Basaltovoe FES«
19.20 MW
Mykolaiv region,
2019.
Ingulets 2 FES«
24.72 MW
Mykolaiv region,
2019.
Teplychka FES«
13.29 MW
Mykolaiv region,
2019.
FES "Soling 1"«
11.11 MW
Mykolaiv region,
2019.
FES "Soling 2"«
11.11 MW
Mykolaiv region,
2019.
Solar power plant "Solone"«
13.07 MW
Zaporizhia region.
2019.
Myrolyubivka FES«
11.48 MW
Kherson region.
2019.
FES "Vasylivka 1"«
31.01 MW
Kherson region.
2019.
FES "Vasylivka 2"«
11.77 MW
Kherson region.
2019.
FES "Vasylivka 3"«
5.91 MW
Kherson region.
2019.

Name
Power
Arrangement
Year of construction
FES "Babanka"«
3.54 MW
Cherkasy region.
2020.
Tanske FES«
2.86 MW
Cherkasy region.
2020.
Tarasivtsi FES«
58.78 MW
Chernivtsi region.
2020.
FES "Mykhailyuchka"«
12.93 MW
Khmelnytskyi region.
2020.

Solar power plants built:

Name
Power
Arrangement
Year of construction
FES "Kostogrizove"«
18.064 MW
Kherson region.
2018.
Kyselivka FES«
17.702 MW
Kherson region.
2018.
FES "Poniativka"«
18.819 MW
Kherson region.
2018.
FES "Afanasiyevka"«
20.463 MW
Kherson region.
2018.

Name
Power
Arrangement
Year of construction
FES "Lyubymovka"«
11.115 MW
Mykolaiv region.
2019.
Basaltova FES«
19.198 MW
Mykolaiv region.
2019.
Stepnogorsk FES«
19.205 MW
Zaporizhzhia region.
2019.
FES "Balivka"«
21.669 MW
Dnipropetrovsk region.
2019.
FES "Yelanets 1"«
13,100 MW
Mykolaiv region.
2019.
Pogrebishche FES«
11.7 MW
Vinnytsia region.
2019.
FES "Belashki"«
7.8 MW
Vinnytsia region.
2019.
FES "Shyroke"«
4.5 MW
Dnipropetrovsk region.
2019.
FES "Mykhailivka"«
11 MW
Khmelnytskyi region.
2019.
FES "Yelanets 2"«
6.5 MW
Mykolaiv region.
2019.
FES "Bereznehuvate"«
13,430 MW
Mykolaiv region.
2019.
FES "Novokantakuzivka"«
13.288 MW
Mykolaiv region.
2019.
Ingulets 1 FES«
32.83 MW
Mykolaiv region.
2019.
Lazurne FES«
3.50 MW
Mykolaiv region.
2019.
Starozavodske FES«
10.0 MW
Dnipropetrovsk region.
2019.
FES "Pokrovka"«
90.09 MW
Dnipropetrovsk region.
2019.
Uladovka FES«
4.2 MW
Vinnytsia region.
2019.
Ingulets 2 FES«
24.72 MW
Mykolaiv region,
2019.
Teplychka FES«
13.29 MW
Mykolaiv region,
2019.
FES "Soling 1"«
11.11 MW
Mykolaiv region,
2019.
FES "Soling 2"«
11.11 MW
Mykolaiv region,
2019.
Solar power plant "Solone"«
13.07 MW
Zaporizhia region.
2019.
Myrolyubivka FES«
11.48 MW
Kherson region.
2019.
FES "Vasylivka 1"«
31.01 MW
Kherson region.
2019.
FES "Vasylivka 2"«
11.77 MW
Kherson region.
2019.
FES "Vasylivka 3"«
5.91 MW
Kherson region.
2019.

Name
Power
Arrangement
Year of construction
FES "Babanka"«
3.54 MW
Cherkasy region.
2020.
Tanske FES«
2.86 MW
Cherkasy region.
2020.
Tarasivtsi FES«
58.78 MW
Chernivtsi region.
2020.
FES "Mykhailyuchka"«
12.93 MW
Khmelnytskyi region.
2020.

FES
Afanasyivka

Peak power 20.46 MW

FES
Favorite
Peak power 11.20 MW
FES
Bone-grinding
Peak power 18.00 MW
FES
Basalt

Peak power 19.99 MW

FES
Babanka

Peak power 3.54 MW

FES
Tanskoye

Peak power 2.86 MW

FES
Mykhailivka

Peak power 11.00 MW

FES
Whites

Peak power 7.91 MW

FES
Cemetery

Peak power 11.54 MW

FAQ

  1. We have real experience in designing and building solar power plants. Our company has designed and built more than 82 solar power plants with a capacity of 1320.32 MW.
  2. All modern construction machinery and equipment are available for the implementation of projects of any complexity;
  3. The company has a large group of qualified personnel for the implementation of energy construction projects, as well as the construction of renewable energy generation facilities.
  4. We provide service;
  5. We support our clients at all stages of project implementation;
  6. We provide consulting services on technical and financial issues related to the use of solar energy;
  7. We have all the necessary licenses to perform construction and installation work on the installation of photovoltaic power plants;
  8. We provide consulting services regarding permitting and approval procedures for obtaining a "green" tariff;
  9. We provide operational and maintenance services;
  10. We perform a full range of work: from analyzing the feasibility of building a solar power plant to implementing the project;
  11. We install solar power plants in all regions of Ukraine. You can view our work in the “Projects” section;
  12. We use only certified equipment from reliable global manufacturers and partners;
  13. We provide warranty obligations; 

14. We adhere to high standards of production safety, technical and environmental regulations.

  • topo-geodetic and subdivision works, site preparation and plan creation;
  • earthworks – foundation preparation (piles or concreting), installation of metal structures,
  • installation of equipment - photovoltaic panels, inverters, batteries (not always, depends on the type of station), other equipment as needed;
  •  laying cables and wires, connecting to TP.
  • design work;
  • preparatory work (planning of the construction site, construction of temporary roads);
  • fence installation;
  • arrangement of fuel fields;
  • installation of PEM fastening systems;
  • installation of PEM;
  • earthworks;
  • electrical installation work;
  • installation of lightning protection, lighting, security and monitoring systems;
  • construction of solar power plants;
  • construction (installation) of KTP;
  • connection to an external network;
  • implementation of ASKOE.
  • Solar panels;
  • Inverter;
  • Battery;
  • DC/AC protection kits;
  • Mounting kit;
  • Cables, consumables;

We are happy to answer all your questions.